Abstract:  
           
          This paper describes a Croatian educational experience about 
          the possibility of implementing a combination of the famous method 
          of “work study” and the most modern simulation software to improve 
          construction production. For the first time the students observed the 
          capital technological construction processes “on site” and then measured 
          the necessary time for their execution by the well known “chronometric” 
          method. During the second exercise they analyzed the real 
          observed processes and the sample of collected data. After that, they 
          made a “graphic-simulation” model using the best-known software“Stroboscope” for simulating “just” the construction technological 
          processes. At the end of their training exercise, the students concluded 
          about the possibilities of improving technological construction processes 
          on a “real site”. The main goal of this paper was to describe the“real process” of real education for some regular Croatian students. 
          The simulation of construction processes, with real collection of data, 
          may train the students about what to do in real situations. Of course, 
          this paper presents only the general approach without greater detail. 
          Keywords: 
             
            Construction Management, 
            Productivity Estimation, 
            Chronometric Measurement 
            System, Discrete-Event 
            Simulation Systems, Croatian 
            Construction Sector 
              |